Using the high-low method of analysis, the estimated variable cost per machine hour for electricity is closest to:

A) $0.40
B) $0.65
C) $0.70
D) $0.67

High-low Method

A method employed in managerial accounting that calculates variable and fixed costs by analyzing the highest and lowest activity levels.

Variable Cost

Variable Cost consists of expenses that vary directly with levels of production or sales volume.

Machine Hour

A machine hour is a unit of measure that represents the operation of a machine for one hour, used in allocating manufacturing costs based on time.

  • Understand and apply the high-low method to analyze cost behavior.
  • Estimate variable cost per unit/activity.